Quote Builder
Only enter size, price, and job specifics. Everything else auto-calculates.
Step 1 — Job details
Quick inputsCoated surfaces add coating cost automatically.
Step 2 — Price to customer
Only pricing inputEverything else is calculated from this.
Step 3 — Labour & travel
Auto time supportedEnable auto-fill to keep this matched to wall size.
Auto-fill on-site hours from estimate
Admin assumptions
Locked by default
Locked
Staff should not change assumptions. Unlock requires password.
Time settings
drives auto-hours0.8 textured/white-heavy, 1.0 normal, 1.2 easy wall.
Costs & consumables
USD → AUD via FX
Allocate overhead into job cost
Print/PDF details
customer quoteResults
Live totals update as you type.
Total Area
0 sqm
Surface:
Customer Total (ex GST)
$0
$0/sqm
Total Cost (ex GST)
$0
$0/sqm cost
Gross Profit / Margin
$0
0% margin
| Cost component | Rate | Cost (AUD) |
|---|---|---|
| Ink | $0/sqm | $0 |
| Printhead depreciation | $0/sqm | $0 |
| Coating (if applicable) | $0/sqm | $0 |
| Waste / reprint allowance | 0% | $0 |
| Labour (on-site + design) | $0/hr | $0 |
| Travel (km + parking/tolls) | $0/km | $0 |
| Allocated overhead (optional) | $0/sqm | $0 |
| Total Cost | $0 |
Payment schedule
autoDeposit (0%)
$0
Balance on completion
$0
GST: $0 | Total inc GST: $0
Break-even (monthly)
autoMonthly fixed costs
$0
Contribution per sqm
$0
Break-even sqm
0 sqm
Break-even uses variable-only contribution (correct even if overhead allocation is ON).
Quote list
multi-job| Ref | Site | sqm | $ /sqm | Total | Margin | Actions |
|---|---|---|---|---|---|---|
| No quotes added yet. | ||||||